The Project

Pacy and Wheatley Educational Design and Build Construction extensive project comprised the design and construction of:
A New Two Storey Post 16 Block to complement the existing adjacent science block.
A New Two Storey Science Block Extension and upgrade to the existing science block.
Alterations to Existing Training and Conference Centre.
Alterations to Existing Technology Block.
Alterations to Existing Post 16 Area within Block 6 to form New ICT Suite.
Ancillary work included external services, drainage, roads, fences, car park and landscaping work
Also included in the build was a full commercial catering facility.

The Challenge

Working within the grounds of a fully occupied and busy High School.Sensitive routing and distribution of mechanical and electrical services from the main school block to the new facilities.Working to a tight construction program to ensuredelivery of the project to achieve opening for the new school term and pupil intake.Maintaining intergrity & watertightness of shallow pitch cladded roofs during extension to science block.Control & Working over a wide spread area of the school complex, all during term time.


The Solution

Careful selection of sub contractors to ensure the highest standards were achieved.
Excellent site management and coordination of trades.
Close liasion with the clients and our design team ensured we achieved the right design solutions first time.
Use of innovative products to overcome on site design challenges.
Weekly meetings to review school logistics for pupils routes and access to ensure highest levels of safety were maintained.

Key Achievements

Project completed within 40 weeks of a 48 week program.
Highest standards achieved.
97% waste removed from site was recovered for recycling.
Health & safety: zero reportable accidents on site.
Achieving the clients budget.

Testimonials
Pacy & Wheatley have over a number of years, carried out several large refurbishment contracts which have been designed and concluded to the highest standard and within budget. So when we wanted to build a new Post 16 block we had no hesitation to award the contract to Pacy & Wheatley, once again the service was excellent and all the staff were professional, the contract was on time and budget. From a customer’s point of view a perfect partner for any building project.
Shaun Cuthbert Premises Manager Minsthorpe Academy Trust.

Click here to return to Pacy & Weatley 




Social Media Management by Multi Web Services

Wednesday 18 June 2014

Healthcare Construction | Rotherham


Project Large Image 510 x 330

                           1st Small Image 300 x 250   2nd Small Image 300 x 250

The Project

Pacy and Wheatley Healthcare Construction project comprised three single storey extensions with the works phased to allow the centre to remain operational throughout. In addition to the construction of two consulting room extensions, the main extension was a new patient waiting area to accommodate additional services. Extensive internal works and remodelling including a new M&E installation were completed as part of the scheme, with disabled access ramps and external landscaping.

The Challenge

As the site was to remain operational throughout the course of the project it was imperative to set up the site and works to maximise access for the staff and patients. Extensive demolition to allow the new extensions were completed with the utmost care and consideration to staff and patients occupying the centre. Good management of large deliveries was essential as the site was sandwiched between a busy main road and a shared drive of a residential property.

The Solution

A phasing plan was produced following liaison with the client to ensure that areas of works were appropriately segregated from the occupied areas and members of the public. All service shutdowns were with prior arrangement and out of hours to minimise down time and disruptions.

Demolition works were carried out by hand as far as reasonably practical and any particularly heavy tasks, close to the live area, were dealt with out of surgery hours. The works were well contained with hoardings to segregate the potential hazards from the public areas.

A traffic management plan was drawn up at the start of the contract and issued to all contractors & suppliers. This helped manage the potential to disrupt a very busy route for commuters through to Sheffield city centre. We also requested deliveries to be out of peak traffic hours. A good relationship was formed and maintained with the neighbour whose shared drive had to be utilised for access to the rear of the property.


Key Achievements

The successful handover to achieve our clients pre-arranged open evening involved immense flexibility and additional work from all involved. Inclement weather throughout the project coupled with additional works meant that the programme was extremely tight; however we handed over to the client prior to the planned opening day. The project was safely managed despite the tight programme, congested working area and close proximity to the live areas resulting in zero reportable incidents.