Tuesday 18 August 2015

Live Project | Town House Property Development

Town-House-Property-Development-Sheffield

Well Meadow Street
Town House Development

  • CLIENT:
  • SECTOR:
  • TYPE:
  • PROCUREMENT:
  • LOCATION:
  • PROJECT VALUE:
  • Brantingham Property Services
  • Residential
  • Design & Build
  • Tender/ Negotiation
  • Sheffield
  • £550K







The Project

Construction of a block of 2 Townhouses, each having 7 bedrooms, with shared living and utility areas, the building extending over 5 floors Project build to comply with Code for sustainable homes – level 3 and secure by design.
The building will be of Traditional Masonry Construction with engineered timber intermediate floors and the 3rd floor being part timber framed construction. The development will also benefit from a PV installation.

The Challenge


Site access and build logistically challenged.Extremely tight site.
Ensuring and maintaining the Safety and comfort of the residents occupying the adjoining Town House Block and Upper Allen Street residential development generally.